​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Patrick ate 3/5 of a small pizza on Friday night. For lunch on Saturday , he ate 1/2 of the leftover pizza. How much pizza did he eat for lunch on Saturday?
what is the negative of -1/3 and why??
a swimming pool holds 375,000 liters of water. two large hoses are used to fill the pool. the first hose fills at a rate of 1500 liters per hour and the second
What causes chemical weathering?
I forgot what are homophones.Does anyone know what's a homophone.
The ratio of Sam age to Hanks is 5 to 3. If the sum of their ages is 24, how old is Hank?
The ratio of Sam age to Hanks is 5 to 3. If the sum of their ages is 24, how old is Hank?
The tropical climate zone is in which two states?
in what situation does friction make an object change its shape
Given that 500w = 3 * 700, find the value of w.