alynaislate
alynaislate alynaislate
  • 01-10-2020
  • Physics
contestada

An apple weighing 1.0 N is lifted 3 m. How much work has been done?

Respuesta :

shimbi
shimbi shimbi
  • 03-10-2020

Answer:

work done is given by force multiply by distance.

convert 3m to cm which is 300cm

then W=Fxd

1.0N300cm

W=300J

Answer Link

Otras preguntas

Compared with the electronegativities of the elements on the left end of a particular period, the electronegativities of the elements on the right side of that
Mark each statement if it correctly describes Buddhism after the Buddha’s death MULTIPLE ANSWERS (MORE THAN 1)
20 POINTS! WILL MARK BRAINLIEST! ANSWER QUICK! MAKE SURE TO SHOW WORK OR EXPLAIN WORK! PREFERABLY SHOW WORK! Scott's flight is scheduled to travel 1,792 miles i
What were chemists doing by stripping away oxygen from substances such as rocks and ore?
|2k+3|=7absolute value
What presidential candidate was honored at 200 southeast 4th street, abilene, kansas? and who ran for the office of vice president with this person?
factorize 16x - 6 and show correct and full working.
read the passage the mountain is high, the sea is deep, the strife of kings makes all men weep. Go, hero bold, into the world and bring ye back the prize of pea
What is 16 less then half of a number into an algebraic expression.
The _______ rate of absorption of carbon dioxide in the oceans is causing them to become more _______. decreasing; acidic decreasing, alkaline decreasing; produ