how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

How do you use equal protection of law in a sentence
Subtract: 6lb 4oz - 2lb 10oz
Rheumatic fever is a bacterial disease that can result in degeneration of heart valves that would cause?
Carla's plant was 10 2/3 inches tall. Yolanda's was 8 3/4 inches tall. How much taller was Carla's plant than Yolanda's?I came up with 2 11/12.   Am I right??
A uniform wire is cut into 4 segments. Each segment is twice as long as the earlier segment. If the shortest segment has a resistance of 4 ohm, find the resista
Carla's plant was 10 2/3 inches tall. Yolanda's was 8 3/4 inches tall. How much taller was Carla's plant than Yolanda's?I came up with 2 11/12.   Am I right??
Solve for x/4-x+2/6=x/3
Write 3/5, 1 2/3, 15/7, 1/2, 2 5/8, and 9/4 in order from least to greatest!!!
please help :-( thanks
solve for y.try factoring first,if factoring is not possible or difficult use quadratic formula,(y2  2isabovey -10y+23=0)