fosterjoseph5716 fosterjoseph5716
  • 02-05-2021
  • Mathematics
contestada

If six girls can finish sweeping the floor of a hall in 45mins,how long will the same work take ten girls to do

Respuesta :

cmckee660
cmckee660 cmckee660
  • 02-05-2021

Answer:

15 minutes i think

Step-by-step explanation:

45÷6=7.5

meaning 7.5 minutes per girl

so 4 girls would be 30 minutes of work

so 45-30=15

Answer Link

Otras preguntas

Please help on “C” and “D” NOW!!!
Read the following story. Keiko sat in a circle with four others, their eyes downcast, their posture slumped. No one said a word. Outside the window storm c
Factor completely, then place the factors in the proper location on the grid. x^2n + 10x^n + 16
As the tides of political popularity rise and fall, would it be possible for the ideals of the Moral Majority to resurge? What would have to take place in socie
What is a delocalized pi bond?
How was the country of Turkey created?
I need these immediately bc I only have an hour left & I have to answer 25 questions
Help me please it’s in the picture
Show the steps in this word problem, A mother is 1 3/4 as tall as her son. Her son is 3 feet tall. How tall is the mother?
Please help me on #30 and explain thank you