sanishchamlagai0
sanishchamlagai0 sanishchamlagai0
  • 02-10-2021
  • Social Studies
contestada

which was the first hydropower situation of Nepal?​

Respuesta :

408478
408478 408478
  • 02-10-2021

Answer:

Pharping

Explanation:

The first hydropower project in Nepal was commissioned on 22nd May 1911 (inaugurated by late King Prithvi Bir Bikram Shah) in Pharping, about 10 km south of Kathmandu, using water from two spring sources, Satmule and Shikha Narayan3, with installed capacity of 500 kW.

Answer Link

Otras preguntas

Circle A has center of (6, 7), and a radius of 4 and circle B has a center of (2, 4), and a radius of 16. What steps will help show that circle A is similar to
Identify Earths seven continent
I NEED HELP ASAP The magician gives them to Ah Fo as a reward for rescuing the emperor. 1. Ah Fo asks the magician for suggestions 2. Ah Fo asks for a day to
Is 0.2 a terminating or repeating decimal?
12a-12b+12c please help to simplify
Directions: Factor 15x2 – 25x - 40
Kobina sells apple pies for 10gh each.kojo sells beverages for ghc1 each.if kobina sells 23 apple pies and kojo sells 17 beverages,what is the total in sales fo
3. The length of a ribbon is 0.375 meter. Which value also represents the length, in meters, of the ribbon?
How do you get 10,11,13 by using 4s only? I can’t use square roots.
[tex]-3c+8=-10[/tex]