nikolaungurian nikolaungurian
  • 03-03-2022
  • Mathematics
contestada


It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

World map Match the number on the map with the name of the Continent or Ocean. Question 9 options: Pacific Ocean South America Asia Atlantic Ocean Ind
A 5 kg block is pushed against a vertical wall by applying a horizontal force of 80 N. The coefficient of static friction between the block and the wall is 0.4.
Simalirities between procedural text and nonprocedural text
2x-6=6, i need to get the explicit answer.
Faith, Agnes and Precious shared a profit of their business in the ratio 3:7-9 respectively. If Agnes received sh 60,000, find how ! much profit the business re
lizzie is measuring two lines. the first line is 30 centimeters long. the second line is 500 millimeters long. what is the total length is centimeter
when marginal product ________ average product, average product is ________. a. is greater than; decreasing is greater thanb. increasing equals; decreasing is l
Pls help me it’s about math ?
Is a fracture a contraindication for electrical stimulation therapy? A. Yes B. No
What’s the next number