In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Define a function CoordTransform() that transforms the function's first two input parameters xVal and yVal into two output parameters xValNew and yValNew. The f
Select ONE (1) keepsake or souvenir that represents a meaningful event from your life, an event that you are willing to write about. Write 3-5 sentences that ex
The signifcance of the poquot war of 1637 was that
What is the sum of the polynomials
Why do the plates on Earth’s surface move?
solve |4x +5| = |-29 +4x| pls add step by step directions, I have a test tomorrow and need to know how to do this
HELP HLEP!!!!!!!!2.1.31 Lightning travels much faster than thunder, so lightning is seen before thunder is heard. Using inductive reasoning and the graph to the
calculate the calculate the perimeter of square 5:3 cm​
5. What value of x makes the equation -5x - (-7- 4x) = -2(3x - 4) true? x = 5 = x=3 = CLEAR ALL Unanswered
A rectangle is drawn so that the width is 1 feet shorter than the length. The area of the rectangle is 56 square feet. Find the length of the rectangle.